科技报告详细信息
Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program
RUNG, M.P.
COGEMA (United States)
关键词: Management;    Installation;    Stabilization;    Pipes;    Remedial Action;   
DOI  :  10.2172/803945
RP-ID  :  RPP-6153, Rev.0
RP-ID  :  AC27-99RL14047
RP-ID  :  803945
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms.

【 预 览 】
附件列表
Files Size Format View
803945.pdf 891KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:15次