Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453
MCGRATH, G.M.
Fluor Hanford, Inc.
关键词: Materials Handling Equipment;    Storage;    Installation;    Program Management;    Stabilization;   
DOI  :  10.2172/803927
RP-ID  :  HNF-4681, Rev.1
RP-ID  :  AC06-96RL13200
RP-ID  :  803927
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

【 预 览 】
附件列表
Files Size Format View
803927.pdf 4211KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:19次