科技报告详细信息
Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program | |
TORRES, T.D. | |
COGEMA (United States) | |
关键词: Radioactive Waste Storage; Installation; Stabilization; Pipes; Performance Testing; | |
DOI : 10.2172/804480 RP-ID : RPP-6153, Rev.1 RP-ID : AC27-99RL14047 RP-ID : 804480 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
804480.pdf | 1049KB | download |