科技报告详细信息
CH Packaging Operations Manual
Washington TRU Solutions, LLC
Waste Isolation Pilot Plant (N.M.)
关键词: Trupact-Ii;    Assembly;    Manuals Payload;    Wipp;    Packaging;   
DOI  :  10.2172/876682
RP-ID  :  DOE/WIPP-02-3184, Rev. 2
RP-ID  :  AC29-01AL66444
RP-ID  :  876682
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing SWB Payload Assembly; and 1.7, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed.

【 预 览 】
附件列表
Files Size Format View
876682.pdf 1309KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:62次