科技报告详细信息
CH Packaging Operations Manual | |
Washington TRU Solutions, LLC | |
Waste Isolation Pilot Plant (N.M.) | |
关键词: Trupact-Ii; Assembly; Manuals Payload; Wipp; Packaging; | |
DOI : 10.2172/876682 RP-ID : DOE/WIPP-02-3184, Rev. 2 RP-ID : AC29-01AL66444 RP-ID : 876682 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing SWB Payload Assembly; and 1.7, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
876682.pdf | 1309KB | download |