科技报告详细信息
CH Packaging Operations Manual
Solutions, Washington TRU
Waste Isolation Pilot Plant (N.M.)
关键词: Tdop;    Trupact-Ii;    Sarp;    Assembly;    Installation;   
DOI  :  10.2172/814952
RP-ID  :  DOE/WIPP-02-3184, Rev. 0
RP-ID  :  AC04-01AL66444
RP-ID  :  814952
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】
Introduction - This procedure provides instructions for assembling the following CH packaging payload: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP).
【 预 览 】
附件列表
Files Size Format View
814952.pdf 598KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:33次