科技报告详细信息
CH Packaging Operations Manual | |
Solutions, Washington TRU | |
Waste Isolation Pilot Plant (N.M.) | |
关键词: Tdop; Trupact-Ii; Sarp; Assembly; Installation; | |
DOI : 10.2172/814952 RP-ID : DOE/WIPP-02-3184, Rev. 0 RP-ID : AC04-01AL66444 RP-ID : 814952 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
Introduction - This procedure provides instructions for assembling the following CH packaging payload: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP).
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
814952.pdf | 598KB | download |