科技报告详细信息
CH Packaging Program Guidance
Westinghouse TRU Solutions LLC
Waste Isolation Pilot Plant (N.M.)
关键词: Safety Analysis;    Management;    Sarp;    Transportation;    Wipp Contact Handled;   
DOI  :  10.2172/814946
RP-ID  :  DOE/WIPP-02-3183, Rev. 1
RP-ID  :  AC04-01AL66444
RP-ID  :  814946
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP charges the WIPP management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 CFR 71.11. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

【 预 览 】
附件列表
Files Size Format View
814946.pdf 723KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:17次