科技报告详细信息
CH Packaging Operations Manual | |
Washington TRU Solutions, LLC | |
Waste Isolation Pilot Plant (N.M.) | |
关键词: Trupact-Ii; Halfpack; Standard Waste Box; Payload; 12 Management Of Radioactive And Non-Radioactive Wastes From Nuclear Facilities Trupact-Ii; | |
DOI : 10.2172/876684 RP-ID : DOE/WIPP-02-3184, Rev. 3 RP-ID : AC29-01AL66444 RP-ID : 876684 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This procedure provides instructions for assembling the CH Packaging Drum payload assembly, Standard Waste Box (SWB) assembly, Abnormal Operations and ICV and OCV Preshipment Leakage Rate Tests on the packaging seals, using a nondestructive Helium (He) Leak Test.【 预 览 】
Files | Size | Format | View |
---|---|---|---|
876684.pdf | 1383KB | download |