CH Packaging Program Guidance | |
Westinghouse TRU Solutions LLC | |
Waste Isolation Pilot Plant (N.M.) | |
关键词: Wipp; Contractors; Regulations; O-Ring; Transuranic; | |
DOI : 10.2172/876675 RP-ID : DOE/WIPP-02-3183, Rev. 2 RP-ID : AC29-01AL66444 RP-ID : 876675 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
876675.pdf | 579KB | download |