科技报告详细信息
| CH Packaging Operations Manual | |
| Westinghouse TRU Solutions LLC | |
| Waste Isolation Pilot Plant (N.M.) | |
| 关键词: Manuals; Wipp; Nrc; 12 Management Of Radioactive Wastes, And Non-Radioactive Wastes From Nuclear Facilities; O-Ring; | |
| DOI : 10.2172/814951 RP-ID : DOE/WIPP-02-3184, Rev. 1 RP-ID : AC04-01AL66444 RP-ID : 814951 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
Introduction - This procedure provides instructions for assembling the following CH packaging payload: -Drum payload assembly -Standard Waste Box (SWB) assembly -Ten-Drum Overpack (TDOP).
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 814951.pdf | 664KB |
PDF