科技报告详细信息
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
National Energy Technology Laboratory (U.S.)
关键词: Installation;    01 Coal, Lignite, And Peat;    Design;    Fossil-Fuel Power Plants;    Air Pollution Control;   
DOI  :  10.2172/794131
RP-ID  :  FC26-00NT40757--06
RP-ID  :  FC26-00NT40757
RP-ID  :  794131
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This is the 6th Quarterly Report under this contract. During this period, the Advanced ElectroCore module precharger and its support frame were installed at Alabama Power Company's E.C. Gaston Steam Plant in Wilsonville, Alabama. This represents the vast portion of the installation work. Ductwork and instrumentation needs to installed before the Advanced ElectroCore module can be tested and demonstrated. Also, the Advanced ElectroCore test plan draft has been prepared, and a design arrangement of a new multipollutant control system with the ElectroCore has been developed.

【 预 览 】
附件列表
Files Size Format View
794131.pdf 18KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:23次