科技报告详细信息
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
National Energy Technology Laboratory (U.S.)
关键词: Particulates;    Fossil-Fuel Power Plants;    01 Coal, Lignite, And Peat;    Dry Scrubbers;    Mercury;   
DOI  :  10.2172/791497
RP-ID  :  FC26-00NT40757--05
RP-ID  :  FC26-00NT40757
RP-ID  :  791497
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Mercury measurements were made by Southern Research Institute and conformed to the Ontario Hydro Method. EPA's current Reference Method 29A is for total mercury, whereas the Ontario Hydro procedure is capable of identifying the composition and species of the total mercury. One of the disadvantages of the Ontario Hydro Method is that it requires several weeks to complete the full analysis due to its extensive laboratory procedures. Mercury measurements were also obtained with a PS Analytical Continuous Emission Monitor (CEM) owned by the U.S. EPA and contributed to this project by EPA's fine particulate group in Research Triangle Park. The PSA CEM functions on the principle of atomic fluorescence and is capable of measuring trace concentrations of mercury in water or air. The instrument was setup to monitor elemental and total mercury at the dry scrubber inlet and ElectroCore outlet. Each cycle required about 20 minutes to complete. Thus, the monitoring was not in ''real time'' in a strict sense, but did provide mercury tracking in continual batch processing. Particulate measurements were determined by EPA Method 5 as well as with a P5A continuous monitor. The P5A is on loan to the project through EPA and SRI. Calibration factors for the device were provided by SRI. All particulate data was analyzed and interpreted by LSR Technologies, with technical input from Armstrong Environmental and SRI.

【 预 览 】
附件列表
Files Size Format View
791497.pdf 205KB PDF download
  文献评价指标  
  下载次数:25次 浏览次数:12次