科技报告详细信息
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS
National Energy Technology Laboratory (U.S.)
关键词: 01 Coal, Lignite, And Peat;    Design;    Fossil-Fuel Power Plants;    Air Pollution Control;    Alabama;   
DOI  :  10.2172/785168
RP-ID  :  FC26-00NT40757--04
RP-ID  :  FC26-00NT40757
RP-ID  :  785168
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This is the 5th Quarterly Report under this contract. During this period the fabrication of the Advanced ElectroCore field prototype was completed and the unit was prepared to be transported to Alabama Power Company's E.C. Gaston Steam Plant in Wilsonville, Alabama. A last minute check of the installation drawings indicated that the supports would interfere with an existing pipe trench at the plant so a cross-trench support frame was designed and built to span the pipe trench. Figure 1 shows the revised position and the new cross-trench support frame that supports the precharger.

【 预 览 】
附件列表
Files Size Format View
785168.pdf 758KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:12次