科技报告详细信息
INTEGRATED SYSTEM TO CONTROL PRIMARY PM 2.5 FROM ELECTRIC POWER PLANTS | |
National Energy Technology Laboratory (U.S.) | |
关键词: 01 Coal, Lignite, And Peat; Design; Fossil-Fuel Power Plants; Air Pollution Control; Alabama; | |
DOI : 10.2172/785168 RP-ID : FC26-00NT40757--04 RP-ID : FC26-00NT40757 RP-ID : 785168 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This is the 5th Quarterly Report under this contract. During this period the fabrication of the Advanced ElectroCore field prototype was completed and the unit was prepared to be transported to Alabama Power Company's E.C. Gaston Steam Plant in Wilsonville, Alabama. A last minute check of the installation drawings indicated that the supports would interfere with an existing pipe trench at the plant so a cross-trench support frame was designed and built to span the pipe trench. Figure 1 shows the revised position and the new cross-trench support frame that supports the precharger.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
785168.pdf | 758KB | download |