科技报告详细信息
Multi-Batch Slip Stacking in the Main Injector at FERMILAB. | |
Seiya, K. ; Berenc, T. ; Chase, B. ; Dey, J. ; Joireman, P. | |
Technical Information Center Oak Ridge Tennessee | |
关键词: Particle accelerators; Beam injection; Protons; Particle boosters; Fermilab Tevatron; | |
RP-ID : DE2007913474 | |
学科分类:工程和技术(综合) | |
美国|英语 | |
来源: National Technical Reports Library | |
【 摘 要 】
The Main Injector (MI) at Fermilab is planning to use multi-batch slip stacking scheme in order to increase the proton intensity at the NuMI target by about a factor of 1.5. By using multi-batch slip stacking, a total of 11 Booster batches are merged into 6, 5 double ones and one single. We have successfully demonstrated the multi-batch slip stacking in MI and accelerated a record intensity of 4.6E13 particle per cycle to 120 GeV. The technical issues and beam loss mechanisms for multi-batch slip stacking scheme are discussed.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
DE2007913474.pdf | 561KB | download |