科技报告详细信息
Conceptual Design of a New Transfer Line from Booster to Recycler for the Fermilab Proton Plan Phase 2 Campaign.
Johnson, D. E. ; Xiao, M.
Technical Information Center Oak Ridge Tennessee
关键词: Fermilab tevatron;    Protons;    Linear colliders;    Storage rings;    Beam injection;   
RP-ID  :  DE2007917430
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

Upon the termination of the Fermilab Collider program, the current Recycler anti-proton storage ring (RR) will be converted to a proton pre-injector for the Main Injector (MI) synchrotron. This is scheduled to increase the beam power for the 120 GeV Neutrino program to upwards of 700KW. A transport line that can provide direct injection from the Booster to the Recycler while preserving direct injection from the Booster into the Main Injector and the 8 GeV Booster Neutrino program will be discussed, and its concept design will be presented.

【 预 览 】
附件列表
Files Size Format View
DE2007917430.pdf 470KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:19次