科技报告详细信息
Conceptual Design of a New Transfer Line from Booster to Recycler for the Fermilab Proton Plan Phase 2 Campaign. | |
Johnson, D. E. ; Xiao, M. | |
Technical Information Center Oak Ridge Tennessee | |
关键词: Fermilab tevatron; Protons; Linear colliders; Storage rings; Beam injection; | |
RP-ID : DE2007917430 | |
学科分类:工程和技术(综合) | |
美国|英语 | |
来源: National Technical Reports Library | |
【 摘 要 】
Upon the termination of the Fermilab Collider program, the current Recycler anti-proton storage ring (RR) will be converted to a proton pre-injector for the Main Injector (MI) synchrotron. This is scheduled to increase the beam power for the 120 GeV Neutrino program to upwards of 700KW. A transport line that can provide direct injection from the Booster to the Recycler while preserving direct injection from the Booster into the Main Injector and the 8 GeV Booster Neutrino program will be discussed, and its concept design will be presented.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
DE2007917430.pdf | 470KB | download |