科技报告详细信息
Use of the Granuflow Process in Coal Preparation Plants to Improve Energy Recovery and Reduce Coal Processing Wastes. Quarterly Report.
Technical Information Center Oak Ridge Tennessee
关键词: Coal;    Bitumens;    Coal preparation plants;    Technology;    Commercialization;   
RP-ID  :  DE2005835592
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

GranuFlow setup tests were performed at Edison Mission Energy's Homer City Coal Processing (HCCP) Plant. An asphalt emulsion (CCB as supplied by Asphalt Materials Inc.) was added to the plant's froth flotation concentrate stream at dosages ranging from 3.5% to 5.5%. Baseline tests (no emulsion added) were conducted immediately prior to and after each emulsion test. For each test, samples were collected around a single screen bowl centrifuge, including the centrifuge feed, filter cake product, main effluent, and screen drain effluent. A total of 12 tests were conducted, and each sample analyzed for moisture (percent solids), ash, sulfur, heating value (Btu/lb), and size consist.

【 预 览 】
附件列表
Files Size Format View
DE2005835592.pdf 221KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:34次