Decommissioning Project of A1 Bohunice NPP.
Technical Information Center Oak Ridge Tennessee
关键词: Bohunice A-1 reactor;    Decommissioning;    Coolants;    Fission products;    Fuel elements;   
RP-ID  :  DE2004828453
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

The first (pilot) nuclear power plant A1 in the Slovak Republic, situated on Jaslovske Bohunice site (60 km from Bratislava) with the capacity of 143 MWel, was commissioned in 1972 and was running with interruptions till 1977. A KS 150 reactor (HWGCR) with natural uranium as fuel, D2O as moderator and gaseous CO2 as coolant was installed in the A1 plant. Outlet steam from primary reactor coolant system with the temperature of 410 C was led to 6 modules of steam generators and from there to turbine generators. Refueling was carried out on-line at plant full power.

【 预 览 】
附件列表
Files Size Format View
DE2004828453.pdf 143KB PDF download
  文献评价指标  