科技报告详细信息
First Step in the Final Shutdown of the UP1 Plant: Rinsing with Chemical Reagents.
Moulin, J. P. ; Hubert, N. ; Huot, M. ; Chany, P. ; Oriol, C.
Technical Information Center Oak Ridge Tennessee
关键词: Fuel reprocessing plants;    Chemical reagents;    Decommissioning;    Decontamination;    Radioactive materials;   
RP-ID  :  DE2004828263
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

The COGEMA UP1 reprocessing plant commissioned at Marcoule, France in 1958 handled roughly 20,000 metric tons of fuel from gas-cooled and research reactors. The commercial reprocessing activities of the UP1 plant ended in December 1997. CODEM, a joint venture created by the former users of the UP1 plant, including the utility Electricite de France (EDF), the French Atomic Energy Commission (CEA) and COGEMA, was established to fund and supervise decommissioning of the plant. COGEMA was selected as the industrial operator of the decommissioning project, which is scheduled to span a period of about 40 years. COGEMA, with its CODEM partners, had made the decision to proceed to a 'Final Shutdown' of the plant within a few years after the end of commercial operation. Final shutdown is intended to remove remaining fissile matter and highly radioactive materials, as well as some equipment, from the plant to ease the plant monitoring requirements compared with those applied when the plant was in operation.

【 预 览 】
附件列表
Files Size Format View
DE2004828263.pdf 125KB PDF download
  文献评价指标  
  下载次数:16次 浏览次数:15次