This Accelerated Site Technology Deployment Project (ASTD) was awarded in January 2002 to accelerate schedules, reduce costs, and minimize pollution through technology deployments in the areas of facility characterization, sludge treatment, dust and contamination control, and concrete demolition. Specifically, this project was to deploy the following commercially available technologies in decontamination and decommissioning (D&D) projects: (1)Russian Gamma Locator Device (GLD) and Isotopic Identification Device (IID) for remote characterization; (2)LEADX sludge stabilization technology (or a similar compound) for immobilization of heavy metals; (3)Passive aerosol fogging for control of dust-borne contamination; and (4)SureStrike Rock Breaker (Hammerhead) for concrete demolition.