科技报告详细信息
Diagnostic Systems Plan for the Advanced Light Source Top-Off Upgrade.
Barry, W. ; Chin, M. ; Robin, D. ; Sannibale, F. ; Scarvie, T.
Technical Information Center Oak Ridge Tennessee
关键词: Advanced light source;    Synchrotron radiation;    Upgrades;    Booster ring;    Bunch cleaning;   
RP-ID  :  DE2005861410
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

The Advanced Light Source (ALS) will soon be upgraded to enable top-off operations, in which electrons are quasi-continuously injected to produce constant stored beam current. The upgrade is structured in two phases. First, we will upgrade our injector from 1.5 GeV to 1.9 GeV to allow full energy injection and will start top-off operations. In the second phase, we will upgrade the Booster Ring (BR) with a bunch cleaning system to allow high bunch purity top-off injection. A diagnostics upgrade will be crucial for success in both phases of the top-off project, and our plan for it is described in this paper. New booster ring diagnostics will include updated beam position monitor (BPM) electronics, a tune monitoring system, and a new scraper. Two new synchrotron light monitors and a beam stop will be added to the booster-tostorage ring transfer line (BTS), and all the existing beam current monitors along the accelerator chain will be integrated into a single injection efficiency monitoring application. A dedicated bunch purity monitor will be installed in the storage ring (SR). Together, these diagnostic upgrades will enable smooth commissioning of the full energy injector and a quick transition to high quality top-off operation at the ALS.

【 预 览 】
附件列表
Files Size Format View
DE2005861410.pdf 97KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:27次