| INTEC CPP-603 Basin Water Treatment System Closure: Process Design | |
| Kimmitt, Raymond Rodney ; Faultersack, Wendell Gale ; Foster, Jonathan Kay ; Berry, Stephen Michael | |
| Idaho National Laboratory | |
| 关键词: Removal; Testing; Mockup; Pipelines; Process Design; | |
| DOI : 10.2172/910971 RP-ID : INEEL/EXT-02-01139 RP-ID : DE-AC07-99ID-13727 RP-ID : 910971 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
This document describes the engineering activities that have been completed in support of the closure plan for the Idaho Nuclear Technology and Engineering Center (INTEC) CPP-603 Basin Water Treatment System. This effort includes detailed assessments of methods and equipment for performing work in four areas: 1. A cold (nonradioactive) mockup system for testing equipment and procedures for vessel cleanout and vessel demolition. 2. Cleanout of process vessels to meet standards identified in the closure plan. 3. Dismantlement and removal of vessels, should it not be possible to clean them to required standards in the closure plan. 4. Cleanout or removal of pipelines and pumps associated with the CPP-603 basin water treatment system. Cleanout standards for the pipes will be the same as those used for the process vessels.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 910971.pdf | 17405KB |
PDF