科技报告详细信息
Field Demonstration of Carbon Dioxide Miscible Flooding in the Lansing-Kansas City Formation, Central Kansas
Byrnes, Alan ; Willhite, G. Paul
University of Kansas
关键词: 02 Petroleum;    Testing;    Carbon Dioxide;    Kansas;    Miscible-Phase Displacement;   
DOI  :  10.2172/822998
RP-ID  :  NONE
RP-ID  :  FC26-00BC15124
RP-ID  :  822998
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Progress is reported for the period from July 1, 2003 to September 30, 2003. Conductivity testing between the CO{sub 2}I No.1 and CO{sub 2} No.13 was performed over the period 08/20/03 through 09/05/03. Observed response in CO{sub 2} 13 production rates to changes in CO{sub 2}I No.1 injection rates are consistent with sufficient permeability between CO{sub 2}I No.1 and CO{sub 2} No.13 for a viable CO{sub 2} flood with a sufficient Process Pore Volume Rate (PPV). Based on the permeabilities near the CO{sub 2} No.16, a 2-producing well pattern has been determined to be optimal but may be changed during the flood depending on the response observed in the CO{sub 2} No.16. Present inter-well test results indicate there is greater permeability architecture complexity than originally predicted and that a low-permeability region or barrier that restricts but does stop flow may exist between the CO{sub 2}I No.1 and the CO{sub 2} No.13. Pilot area repressurization began on 09/05/03, immediately after CO{sub 2}I No.1-CO{sub 2} No.13 conductivity testing was complete, by increasing injection in the CO{sub 2}I No.1, CO{sub 2} No.10, and CO{sub 2} No.18. Adequate reservoir pressure in the portion of the pilot area needed to be above minimum miscibility pressure should be reached in November at which time initial CO{sub 2} injection could begin. It is estimated the 2-producing well, 10+-acre (4.05 ha) producing pattern will produce 18,000-21,000 BO (barrels oil; 2,880-3,360 m{sup 3}). Depending primarily on surface facilities costs, operating expenses, and the price of oil, for the predicted range of oil recovery the pilot is estimated to either break-even or be profitable from this point forward. Final arrangements and agreements for CO{sub 2} supply and delivery are being worked on and will be finalized in the next month.

【 预 览 】
附件列表
Files Size Format View
822998.pdf 806KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:23次