科技报告详细信息
RESULTS FOR THE FOURTH QUARTER 2011 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS
Bannochie, C.
Savannah River Site (S.C.)
关键词: Removal;    Liquid Wastes;    Actinides;    Compliance;    Radioactive Materials;   
DOI  :  10.2172/1035779
RP-ID  :  SRNL-STI-2012-00038
RP-ID  :  DE-AC09-08SR22470
RP-ID  :  1035779
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】
The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Fourth Quarter samples collected from Tank 50 on October 12, 2011 and discusses those results in further detail than the previously issued results report.
【 预 览 】
附件列表
Files Size Format View
1035779.pdf 124KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:14次