科技报告详细信息
Accelerator/Experiment Operations - FY 2010
Adamson, M. ; Appel, J.A. ; Casarsa, M. ; Coleman, R. ; Denisov, D. ; Dixon, R. ; Escobar, C. ; Ginther, G. ; Gruenendahl, S. ; Harris, D. ; Henderson, S. ; /Fermilab
关键词: ACCELERATORS;    BEAMS;    FERMILAB ACCELERATOR;    FERMILAB TEVATRON;    INCLUSIONS;    INFORMATION;    MESONS;    NEUTRINO BEAMS Accelerators;   
DOI  :  10.2172/1002014
RP-ID  :  FERMILAB-TM-2477-DI
PID  :  OSTI ID: 1002014
Others  :  TRN: US1100814
学科分类:核物理和高能物理
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2010. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2010 Run II at the Tevatron Collider, the MINOS and MINER?A experiments using the Main Injector Neutrino Beam (NuMI), the MiniBooNE experiment running in the Booster Neutrino Beam (BNB), and the Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120). Each section was prepared by the relevant authors, and was somewhat edited for inclusion in this summary.

【 预 览 】
附件列表
Files Size Format View
RO201704240000516LZ 2323KB PDF download
  文献评价指标  
  下载次数:16次 浏览次数:40次