Accelerator/Experiment Operations - FY 2010 | |
Adamson, M. ; Appel, J.A. ; Casarsa, M. ; Coleman, R. ; Denisov, D. ; Dixon, R. ; Escobar, C. ; Ginther, G. ; Gruenendahl, S. ; Harris, D. ; Henderson, S. ; /Fermilab | |
关键词: ACCELERATORS; BEAMS; FERMILAB ACCELERATOR; FERMILAB TEVATRON; INCLUSIONS; INFORMATION; MESONS; NEUTRINO BEAMS Accelerators; | |
DOI : 10.2172/1002014 RP-ID : FERMILAB-TM-2477-DI PID : OSTI ID: 1002014 Others : TRN: US1100814 |
|
学科分类:核物理和高能物理 | |
美国|英语 | |
来源: SciTech Connect | |
【 摘 要 】
This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2010. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2010 Run II at the Tevatron Collider, the MINOS and MINER?A experiments using the Main Injector Neutrino Beam (NuMI), the MiniBooNE experiment running in the Booster Neutrino Beam (BNB), and the Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120). Each section was prepared by the relevant authors, and was somewhat edited for inclusion in this summary.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RO201704240000516LZ | 2323KB | download |