科技报告详细信息
Accelerator/Experiment Operations - FY 2007
Brice, S. ; Buchanan, N. ; Coleman, R. ; Convery, M. ; Denisov, D. ; Ginther, G. ; Habig, A. ; Holmes, S. ; Kissel, W. ; Lee, W. ; Nakaya, T. ; /Fermilab
关键词: 46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND TECHNOLOGY;    ACCELERATORS;    FERMILAB ACCELERATOR;    FERMILAB TEVATRON;    MESONS;    NEUTRINO BEAMS Accelerators;    Instrumentation;   
DOI  :  10.2172/923069
RP-ID  :  FERMILAB-TM-2401-DO
PID  :  OSTI ID: 923069
Others  :  TRN: US0802200
学科分类:核物理和高能物理
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2007. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2007 Run II at the Tevatron Collider, the MiniBooNE and SciBooNE experiments running in the Booster Neutrino Beam (BNB), MINOS using the Main Injector Neutrino Beam (NuMI), and the Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120). Each section was prepared by the relevant authors, and was somewhat edited for inclusion in this summary.

【 预 览 】
附件列表
Files Size Format View
RO201705190000710LZ 1164KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:30次