科技报告详细信息
241-AY-101 Tank Construction Extent of Condition Review for Tank Integrity
Barnes, Travis J. ; Gunter, Jason R.
关键词: DST;    241-AY Tank Farm;    AY-101;    leak;    tank construction;    extent of condition;   
DOI  :  10.2172/1091344
RP-ID  :  RPP-RPT-54817 Rev 0
PID  :  OSTI ID: 1091344
美国|英语
来源: SciTech Connect
PDF
【 摘 要 】

This report provides the results of an extent of condition construction history review for tank 241-AY-101. The construction history of tank 241-AY-101 has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In tank 241-AY-101, the second double-shell tank constructed, similar issues as those with tank 241-AY-102 construction reoccurred. The overall extent of similary and affect on tank 241-AY-101 integrity is described herein.

【 预 览 】
附件列表
Files Size Format View
RO201704180001833LZ 8739KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:20次