Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints
Make, Muhammad Razif Abdullah^1 ; Rashid, Mohd Fadzil Faisae^1 ; Razali, Muhamad Magffierah^1
Manufacturing Focus Group, Faculty of Mechanical Engineering, Universiti Malaysia Pahang, Pekan, Pahang
26600, Malaysia^1
关键词: High volume products;    Idle time;    Large-sized;    Objective functions;    Resource Constraint;    Test problem;    Two-sided assembly line balancing;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/160/1/012005/pdf
DOI  :  10.1088/1757-899X/160/1/012005
来源: IOP
PDF
【 摘 要 】
Two-sided assembly line balancing (2S-ALB) problems is practically useful in improving the production of large-sized high-volume products. Many published papers have proposed various approaches to balance this well-known ALB problem. However, little attention is given in formulating the 2S-ALB problems. In this paper, 2S-ALB is modelled with four different objective functions comprising minimization of workstations, mated- workstation, idle time and resource constraints. In different with existing model, this paper also considers resource constraint with a mathematical modelling formulation in solving the 2S- ALB problems. The modelling procedures are present for each objective functions with a simple 2S-ALB example problem. Then, the anticipated performance solution is obtained from the test problem.