会议论文详细信息
1st International Conference on Industrial and Manufacturing Engineering
Improving the physical work environment by looking at the effect of work environment factor on SME
工业技术(总论);机械制造
Panjaitan, Nismah^1 ; Ginting, Rosnani^1 ; Wahyuni, Dini^1
Department of Industrial Engineering, Faculty of Engineering, Universitas Sumatera Utara, Jl. Almamater Kampus USU, Medan
20155, Indonesia^1
关键词: High productivity;    Idle time;    Measurement procedures;    Physical work;    Probability law;    Work environments;    Work sampling;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/505/1/012039/pdf
DOI  :  10.1088/1757-899X/505/1/012039
学科分类:工业工程学
来源: IOP
PDF
【 摘 要 】
Each company wants the operator able to work optimally, so that the operator's productivity is expected to increase. Each operator has different productivity at work. Operators who have high productivity in work generate little idle time. One method that can be used to measure how productive someone is at work is the method of work sampling. The method of work sampling is a measurement procedure performed at randomly certain time which is developed based on probability law where the observations are made using randomly taken samples. Using this method, when the operator does the job and when idle can be observed and measured. The performance of work operator I and operator II was 92.77% and 95.18%. While the idle value of operator I and operator II amounted to 7.23% and 4.82%. The data of work operator accuracy I is 92.7 ± 6.1% and idle accuracy data is 7.3 ± 6.1%. The work operator's accuracy data is 95.1 ± 4.9% and the idle accuracy data is 4.9 ± 4.9%.
【 预 览 】
附件列表
Files Size Format View
Improving the physical work environment by looking at the effect of work environment factor on SME 666KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:25次