World Multidisciplinary Earth Sciences Symposium 2017 | |
Analysis of Availability of Longwall-Shearer Based On Its Working Cycle | |
Brodny, Jaroslaw^1 ; Tutak, Magdalena^2 | |
Silesian University of Technology, Roosevelta 26-28 Street, Zabrze | |
41-800, Poland^1 | |
Silesian University of Technology, Akademicka 2 Street, Gliwice | |
44-100, Poland^2 | |
关键词: Accurate analysis; Automatic systems; Mining companies; Mining enterprise; Objective measure; Practical experience; Presented examples; Technical potential; | |
Others : https://iopscience.iop.org/article/10.1088/1755-1315/95/4/042020/pdf DOI : 10.1088/1755-1315/95/4/042020 |
|
来源: IOP | |
【 摘 要 】
Effective use of any type of devices, particularly machines has very significant meaning for mining enterprises. High costs of their purchase and tenancy cause that these enterprises tend to the best use of own technical potential. However, characteristics of mining production causes that this process not always proceeds without interferences. Practical experiences show that determination of objective measure of utilization of machine in mining company is not simple. In the paper methodology allowing to solve this problem is presented. Longwall-shearer, as the most important machine between longwall mechanical complex. Also it was assumed that the most significant meaning for determination of effectiveness of longwall-shearer has its availability, i.e. its effective time of work related to standard time. Such an approach is conforming to OEE model. However, specification of mining branch causes that determined availability do not give actual state of longwall-shearer's operation. Therefore, this availability was related to the operation cycle of longwall-shearer. In presented example a longwall-shearer works in unidirectional cycle of mining. It causes that in one direction longwall-shearer mines, moving with operating velocity, and in other direction it does not mine and moves with manoeuvre velocity. Such defined working cycle became a base for determinate availability of longwall-shearer. Using indications of industrial automatic system for each of working shift there were determined number of cycles of longwall-shearer and availability of each one. Accepted of such way of determination of availability of longwall-shearer enabled to perform accurate analysis of losses of its availability. These losses result from non-planned shutdowns of longwall-shearer. Thanks to performed analysis based on the operating cycle of longwall-shearer time of its standstill for particular phase of cycle were determined. Presented methodology of determination of longwall-shearer's availability enables to obtain information which may be used for optimization of mining process. Knowledge of particular phases of longwall-shearer's operation, in which reduced availability occurs, allows to direct the repairing actions exactly to these regions. Developed methodology and obtained results create great opportunities for practical application and improvement of effectiveness of underground exploitation.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
Analysis of Availability of Longwall-Shearer Based On Its Working Cycle | 394KB | download |