会议论文详细信息
11th Curtin University Technology, Science and Engineering (CUTSE) International Conference
Re-design Facility Layout using Systematic Layout Planning Method: A Case Study : Biopro Cosmeceutical Sdn. Bhd.
工业技术(总论)
Febriandini, I.F.^1 ; Yuniaristanto^2
Logistics System and Business Laboratory, Universitas Sebelas Maret Surakarta, Indonesia^1
Department of Industrial Engineering, Universitas Sebelas Maret Surakarta, Indonesia^2
关键词: Design facilities;    Malaysia;    Material handling costs;    Systematic layout planning;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/495/1/012027/pdf
DOI  :  10.1088/1757-899X/495/1/012027
学科分类:工业工程学
来源: IOP
PDF
【 摘 要 】

High material handling costs can trigger inefficiency in company productivity. In the Biopro Cosmeceutical Sdn. Bhd. in Malaysia, as long as its sustainability results in high material handling costs, which amount to RM 45,793 per month. Material handling costs are classified as very high, therefore, re-layout is needed to reduce material handling costs by using Systematic Layout Planning (SLP) method. From the results of improvements in the layout of the facilities that have been carried out, a savings of 40% are generated or equal to RM 18,209 per month for alternatives 1 and 47% or amounting to RM 21,333 per month for alternatives 2.

【 预 览 】
附件列表
Files Size Format View
Re-design Facility Layout using Systematic Layout Planning Method: A Case Study : Biopro Cosmeceutical Sdn. Bhd. 1421KB PDF download
  文献评价指标  
  下载次数:27次 浏览次数:24次