会议论文详细信息
2019 4th Asia Conference on Power and Electrical Engineering
A Coordinate Method between the System and Bus Load Forecasting in Electricity Market Environment
能源学;电工学
Cai, Qiuna^1 ; Zhang, Qiaoyu^1 ; Liu, Sijie^1 ; Yan, Binjie^1 ; Su, Binghong^1 ; Yi, Jiangwen^2 ; Li, Bing^2
Electric Power Dispatching Control Center of Guangdong Power Grid Co., Ltd., Guangzhou, Guangdong
510600, China^1
Beijing Tsintergy Technology Co., Ltd., Beijing
100080, China^2
关键词: Bus load forecasting;    Coordination mechanisms;    Coordination model;    Credibility models;    Electric power;    Engineering applications;    Least square methods;    Tensile loads;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/486/1/012150/pdf
DOI  :  10.1088/1757-899X/486/1/012150
来源: IOP
PDF
【 摘 要 】

In view of the problems such as excessive tensile load factor of nodal bus and overload of load flow section that often occur during the trial operation of Guangdong Electric Power Spot Market, the coordination mechanism between the system and bus load forecasting results is studied in this paper. Firstly, the time-sharing credibility coordination model of the system-bus is established based on the least square method, so as to achieve the goal of load balance between upper and lower grades and the minimum overall error. Secondly, the different classification of the time-sharing credibility model is studied to adapt to different kinds of situation. Finally, a province is taken as an example to verify the effectiveness of the proposed method, and the results show that it has certain engineering application value.

【 预 览 】
附件列表
Files Size Format View
A Coordinate Method between the System and Bus Load Forecasting in Electricity Market Environment 589KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:16次