会议论文详细信息
4th Asia Pacific Conference on Manufacturing Systems; 3rd International Manufacturing Engineering Conference
Comparison of Two Buyer-Vendor Coordination Models
Astanti, Ririn Diar^1 ; Ai, The Jin^1 ; Gong, Dah-Chuan^2,3 ; Luong, Hunyh Trung^4
Department of Industrial Engineering, Universitas Atma Jaya Yogyakarta, Yogyakarta, Indonesia^1
Department of Industrial and Business Management, Chang Gung University, Guishan Dist., Taoyuan City
33302, Taiwan^2
Supply Chain Division, Chang Gung Memorial Hospital, Guishan Dist., Taoyuan City
33302, Taiwan^3
Department of Industrial and Manufacturing Engineering, Asian Institute of Technology, Bangkok, Thailand^4
关键词: Automotive parts;    Coordination model;    Just-in-time;    Manufacturing strategy;    Original equipment manufacturers;    Production environments;    Production lot size;    Repair shops;   
Others  :  https://iopscience.iop.org/article/10.1088/1757-899X/319/1/012048/pdf
DOI  :  10.1088/1757-899X/319/1/012048
来源: IOP
PDF
【 摘 要 】

This paper develops and compares two mathematical models for describing situation in coordination of buyer and vendor. In this case the vendor which is an Original Equipment Manufacturers (OEMS) of automotive parts, are supplying different type of buyers, i.e. automotive industry, repair shop and automotive dealers. It is well known that automotive industries are operated in Just in Time (JIT) Production Environment, so that the demand behaviour from this buyer has different characteristics than the demand behaviour from other buyers. Two mathematical models are developed in order to depict two different manufacturing strategies as the vendor response dealing with different type of buyers. These strategies are dividing production lot size for each type of buyer and consolidating all buyer's demand in to single production lot size.

【 预 览 】
附件列表
Files Size Format View
Comparison of Two Buyer-Vendor Coordination Models 688KB PDF download
  文献评价指标  
  下载次数:20次 浏览次数:22次