科技报告详细信息
Identification of Issues to be Considered for Plutonium Finishing Plant Accelerated Closure.
Hopkins, A. M. ; Lilly, J. T.
Technical Information Center Oak Ridge Tennessee
关键词: Closures;    Decommissioning;    Planning;    Regulations;    Hanford Reservation;   
RP-ID  :  DE2005837634
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

This paper describes some of the basic issues identified to date related to the proposed closure of the Plutonium Finishing Plant (PFP) site. It is to be used as a preliminary planning supplement to enable application of the many guidance documents that are now available to describe the statutory and DOE requirements for closure of a Hanford site contaminated with low levels of plutonium. The major issues identified herein include: (1) Closure barrier performance, life expectancy and design criteria; (2) Public and interest group acceptability of closure approach; (3) Quantity of plutonium that will remain; (4) Void backfilling prior to barrier placement; (5) Identification of closure zone boundary; and (6) Impact of 241Z and 241Z-361 waste unit closure plans on the PFP surface barrier design.

【 预 览 】
附件列表
Files Size Format View
DE2005837634.pdf 7995KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:11次