The summaries of this project are: (1) Program goal is to design, develop, and demonstrate a 100 kW UPS flywheel electricity system; (2) flywheel system spin tested up to 15,000 RPM in a sensorless, closed loop mode; (3) testing identified a manufacturing deficiency in the motor stator--overheats at high speed, limiting maximum power capability; (4) successfully spin tested direct cooled HTS bearing up to 14,500 RPM (limited by Eddy current clutch set-up); (5) Testing confirmed commercial feasibility of this bearing design--Eddy Current losses are within acceptable limits; and (6) Boeing's investment in flywheel test facilities increased the spin-test capabilities to one of the highest in the nation.