科技报告详细信息
Final Scientific/Technical Report
Strasik, Dr. Michael
The Boeing Company
关键词: Management;    25 Energy Storage;    Phantoms;    Flywheel;    Flywheels;   
DOI  :  10.2172/909279
RP-ID  :  DOE12112
RP-ID  :  FC36-02GO12112
RP-ID  :  909279
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Boeing Phantom Works and its team originally proposed a three-year Phase III SPI project to develop a 30-kWh flywheel with a 100 kW power capability as a power risk management system (RMS) for power users and providers. The chief objectives for the Risk Management System Flywheel were to (1) demonstrate its ability to protect a critical load such as a small data center from swings in power availability, cost, and power factor and (2) show that the RMS flywheel can perform these functions with reduced noise, emissions, and operating costs when compared with non-HTS competitors including batteries, diesel generators, and microturbines.

【 预 览 】
附件列表
Files Size Format View
909279.pdf 887KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:6次