科技报告详细信息
Integrated Power Generation Systems for Coal Mine Waste Methane Utilization. Phase III Final Report, April 25 - October 4, 2004.
Soot, P. M. ; Jesse, D. R. ; Smith, M. E.
Technical Information Center Oak Ridge Tennessee
关键词: Coal mines;    Power generation;    Waste product utilization;    Methane;    Natural resources;   
RP-ID  :  DE2005860870
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】
An integrated system to utilize the waste coal mine methane (CMM) at the Federal No. 2 Coal Mine in West Virginia was designed and built. The system includes power generation, using internal combustion engines, along with gas processing equipment to upgrade sub-quality waste methane to pipeline quality standards. The power generation has a nominal capacity of 1,200 kw and the gas processing system can treat about 1 million cubic feet per day (1 MMCFD) of gas. The gas processing is based on the Northwest Fuel Development, Inc. (NW Fuel) proprietary continuous pressure swing adsorption (CPSA) process that can remove nitrogen from CMM streams. The two major components of the integrated system are synergistic. The byproduct gas stream from the gas processing equipment can be used as fuel for the power generating equipment. In return, the power generating equipment provides the nominal power requirements of the gas processing equipment.
【 预 览 】
附件列表
Files Size Format View
DE2005860870.pdf 3748KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:18次