科技报告详细信息
Bases, Assumptions, and Results of the Flowsheet Calculations for the Decision Phase Salt Disposition Alternatives.
Dimenna, R. A. ; Jacobs, R. A. ; Taylor, G. A. ; Durate, O. E. ; Paul, P. K. ; Elder, H. H.
Technical Information Center Oak Ridge Tennessee
关键词: Savannah river plant;    High-level radioactive wastes;    Flowsheets;    Precipitation;    Safety;   
RP-ID  :  DE2001776787
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

The High Level Waste (HLW) Salt Disposition Systems Engineering Team was formed on March 13, 1998, and chartered to identify options, evaluate alternatives, and recommend a selected alternative(s) for processing HLW salt to a permitted wasteform. This requirement arises because the existing In-Tank Precipitation process at the Savannah River Site, as currently configured, cannot simultaneously meet the HLW production and Authorization Basis safety requirements. This engineering study was performed in four phases. This document provides the technical bases, assumptions, and results of this engineering study.

【 预 览 】
附件列表
Files Size Format View
DE2001776787.pdf 2739KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:4次