科技报告详细信息
Downhole Vibration Monitoring and Control System Quarterly Progress Report No. 13. (Report for October 1, 2005-December 31, 2005).
Cobern, M. E.
Technical Information Center Oak Ridge Tennessee
关键词: Well drilling;    Vibration;    Control systems;    Monitoring;    Vibration damping;   
RP-ID  :  DE2006876014
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

The objective of this program is to develop a system to both monitor the vibration of a bottom hole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and de-sign of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II are: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in drilling laboratories and test wells. Work during this quarter centered on the testing of the rebuilt laboratory prototype and its conversion into a version that will be operable in the drilling tests at Terra Tek Laboratories. In addition, formations for use in these tests were designed and constructed, and a test protocol was developed. The change in scope and no-cost extension of Phase II to January, 2006, described in our last report1, were approved. The tests are scheduled to be run during the week of January 23, and should be completed before the end of the month.

【 预 览 】
附件列表
Files Size Format View
DE2006876014.pdf 1541KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:21次