科技报告详细信息
Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses.
Brown, T.
Technical Information Center Oak Ridge Tennessee
关键词: Environmental restoration;    Site closures;    Safety analysis;    Remeditation;    Decontamination;   
RP-ID  :  DE2005824890
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPS). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D&D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced Basis of Interim Operations (BIOS) with I-HASPS as their safety basis during the closure process.

【 预 览 】
附件列表
Files Size Format View
DE2005824890.pdf 1044KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:18次