科技报告详细信息
NUMI Proton Beam Diagnostics and Control: Achieving 2 Megawatt Capacility.
Childress, S.
Technical Information Center Oak Ridge Tennessee
关键词: Proton beams;    Accelerators;    Neutrinos;    Production;    Protons;   
RP-ID  :  DE2008941177
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

The NuMI proton beam at Fermilab currently delivers 120 GeV protons to the neutrino production target with design beam power capability to 400 kW. Upgrade capability to 700 kW is being prepared, with planning toward delivering 2.3 MW beam provided by the Project X accelerator upgrade plan. We report on the system of beam diagnostics and control used in operation of the NuMI beam. Also considered are the steps to provide a robust system for transport and targeting beam of 2 MW and beyond.

【 预 览 】
附件列表
Files Size Format View
DE2008941177.pdf 400KB PDF download
  文献评价指标  
  下载次数:12次 浏览次数:10次