科技报告详细信息
| NUMI Proton Beam Diagnostics and Control: Achieving 2 Megawatt Capacility. | |
| Childress, S. | |
| Technical Information Center Oak Ridge Tennessee | |
| 关键词: Proton beams; Accelerators; Neutrinos; Production; Protons; | |
| RP-ID : DE2008941177 | |
| 学科分类:工程和技术(综合) | |
| 美国|英语 | |
| 来源: National Technical Reports Library | |
PDF
|
|
【 摘 要 】
The NuMI proton beam at Fermilab currently delivers 120 GeV protons to the neutrino production target with design beam power capability to 400 kW. Upgrade capability to 700 kW is being prepared, with planning toward delivering 2.3 MW beam provided by the Project X accelerator upgrade plan. We report on the system of beam diagnostics and control used in operation of the NuMI beam. Also considered are the steps to provide a robust system for transport and targeting beam of 2 MW and beyond.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| DE2008941177.pdf | 400KB |
PDF