科技报告详细信息
Dismantling of the Reactor Block of the FRJ-1 Research Reactor (Merlin).
Stahn, B. ; Matela, K. ; Zehbe, C. ; Poeppinghaus, J. ; Cremer, J.
Technical Information Center Oak Ridge Tennessee
关键词: Dismantling;    Radioactive waste management;    Research reactors;    Contamination;    Coolant loops;   
RP-ID  :  DE2005827066
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

This report describes the past procedure in dismantling the reactor block of the FRJ-1 research reactor (MERLIN). Furthermore, it gives an outlook on future activities up to the final removal of the reactor block. MERLIN is an abbreviation for Medium Energy Research Light Water Moderated Industrial Nuclear Reactor. The FRJ-1 (MERLIN) was shut down in 1985 and the fuel elements removed from the facility. After dismantling the coolant loops and removing the reactor tank internals with subsequent draining of the reactor tank water, the first activities for dismantling the reactor block were carried out in summer 2001. The relevant license was granted in late July 2001 by the licensing authority specifying 8 incidental provisions. After dismantling the reactor extension (gates of the thermal columns and steel platforms surrounding the reactor block), a heavy-load platform including a casing around the reactor block was constructed. Two ventilation systems with a volume flow of 10,000 and 2 ,000 m3/h will, moreover, serve to avoid a spread of contamination. The reactor block will be dismantled in three phases divided according to upper, central and bottom sections. Dismantling the upper section started in August 2002. This section as well as the bottom section can probably be completely measured for clearance. For this reason, the activities have so far been carried out manually using mechanical and thermal techniques.

【 预 览 】
附件列表
Files Size Format View
DE2005827066.pdf 301KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:12次