Early Entrance Coproduction Plant. Phase II Quarterly Report No. 14.
Ahmed, M. ; Anderson, J. H. ; Benham, C. ; Beery, E. R. ; Brent, F. ; Demirel, D. ; He, M.
Technical Information Center Oak Ridge Tennessee
关键词: Combined-cycle power plants;    Coal;    Construction;    Design;    Electric power;   
RP-ID  :  DE2004834654
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal and/or other carbonaceous feedstocks. The objectives of Phase I were to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan for implementation in Phase II; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology that produces high-value products, particularly those that are critical to our domestic fuel and power requirements.

【 预 览 】
附件列表
Files Size Format View
DE2004834654.pdf 285KB PDF download