EARLY ENTRANCE COPRODUCTION PLANT
Shah, Lalit S. ; Davis, William K.
National Energy Technology Laboratory (U.S.)
关键词: Financing;    01 Coal, Lignite, And Peat;    Gasification;    Coal;    Construction;   
DOI  :  10.2172/788728
RP-ID  :  FC26-99FT40658--09
RP-ID  :  FC26-99FT40658
RP-ID  :  788728
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which produces at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals. The objective is to have these products produced by technologies capable of using synthesis gas derived from coal or coal in combination with some other carbonaceous feedstock. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site and to develop a Research, Development, and Test Plan (RD and T) for implementation in Phase II. The objective of Phase II is to conduct RD and T as outlined in the Phase I RD and T Plan to enhance the development and commercial acceptance of Coproduction technology that produces high-value products, particularly those that are critical to our domestic fuel and power requirements. The project will resolve critical knowledge and technology gaps on the integration of gasification and downstream processing to coproduce some combination of power, fuels, and chemicals from coal and other feedstocks. The objective of Phase III is to develop an engineering design package and a financing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information that will be needed to move the EECP forward to detailed design, construction, and operation by industry.

【 预 览 】
附件列表
Files Size Format View
788728.pdf 453KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:18次