科技报告详细信息
Downhole Vibration Monitoring and Control System. Quarterly Progress Report No. 12. July 1, 2005 thru September 30, 2005.
Cobern, M. E.
Technical Information Center Oak Ridge Tennessee
关键词: Well drilling;    Vibration;    Control systems;    Monitoring;    Vibration damping;   
RP-ID  :  DE2005861456
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II are: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in drilling laboratories and test wells. Work during this quarter centered on the rebuilding of the prototype using the improved valve design described in the Jan-March report1. Most of the components have been received and assembly was nearly complete at the end of the period. Testing started in October and results will be submitted in the next report. The field testing component of this Phase has been rethought. The current plan is to adapt the laboratory prototype for use in a drilling laboratory and run a series of controlled drilling tests with and without the DVMCS. This should give a more quantitative evaluation of its value, which will help us sign a commercialization partner. While this testing is underway, we will order and begin machining parts for full field prototypes to be use in Phase III. A modification application is being submitted in October to reflect these changes.

【 预 览 】
附件列表
Files Size Format View
DE2005861456.pdf 103KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:21次