科技报告详细信息
| Aquifer Testing Recommendations for Supporting Phase II of the T Area Technetium-99 Data Objectives Process | |
| Spane, Frank A. | |
| Pacific Northwest National Laboratory (U.S.) | |
| 关键词: Technetium 99; Pumping; Testing; Storage Facilities; Recommendations; | |
| DOI : 10.2172/965603 RP-ID : PNNL-17433 RP-ID : AC05-76RL01830 RP-ID : 965603 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
Aquifer characterization needs are currently being assessed to optimize pump-and-treat remedial strategies within the 200-ZP-1 operable unit, specifically for the immediate area of the 241-T Tank Farm. This report provides a general discussion of the six identified hydrologic test methods for possible subsequent characterization within the 241-T Tank Farm area and details for implementing the large-scale recovery test after terminating pumping at the 241-Tank Farm extraction well locations.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 965603.pdf | 303KB |
PDF