| INL Wind Farm Project Description Document | |
| Siefert, Gary | |
| Idaho National Laboratory | |
| 关键词: Turbines; Construction; Wind Farm; Capital; 17 Wind Energy; | |
| DOI : 10.2172/963768 RP-ID : INL/EXT-09-16045 RP-ID : DE-AC07-99ID-13727 RP-ID : 963768 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
The INL Wind Farm project proposes to install a 20 MW to 40 MW wind farm on government property, consisting of approximately ten to twenty full-sized (80-meter hub height) towers with 2 MW turbines, and access roads. This includes identifying the optimal turbine locations, building access roads, and pouring the tower foundations in preparation for turbine installation. The project successfully identified a location on INL lands with commercially viable wind resources (i.e., greater than 11 mph sustained winds) for a 20 to 40 MW wind farm. Additionally, the proposed Wind Farm was evaluated against other General Plant Projects, General Purpose Capital Equipment projects, and Line Item Construction Projects at the INL to show the relative importance of the proposed Wind Farm project.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 963768.pdf | 6435KB |
PDF