科技报告详细信息
DIRECT FUEL CELL/TURBINE POWER PLANT
Ghezel-Ayagh, Hossein
FuelCell Energy, Inc. (United States)
关键词: Testing;    30 Direct Energy Conversion;    Implementation;    Turbines;    Construction;   
DOI  :  10.2172/821188
RP-ID  :  NONE
RP-ID  :  FC26-00NT40798
RP-ID  :  821188
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

In this reporting period, a milestone was achieved by commencement of testing and operation of the sub-scale hybrid direct fuel cell/turbine (DFC/T{reg_sign}) power plant. The operation was initiated subsequent to the completion of the construction of the balance-of-plant (BOP) and implementation of process and control tests of the BOP for the subscale DFC/T hybrid system. The construction efforts consisted of finishing the power plant insulation and completion of the plant instrumentation including the wiring and tubing required for process measurement and control. The preparation work also included the development of procedures for facility shake down, conditioning and load testing of the fuel cell, integration of the microturbine, and fuel cell/gas turbine load tests. At conclusion of the construction, the process and control (PAC) tests of BOP, including the microturbine, were initiated.

【 预 览 】
附件列表
Files Size Format View
821188.pdf 307KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:17次