科技报告详细信息
| Final Report - Navajo Electrification Demonstration Project - FY2004 | |
| Kenneth L. Craig, Interim General Manager | |
| Navajo Tribal Utility Authority | |
| 关键词: Installation Navajo, Nedp, Electrification, Line Extension; Navajo, Nedp, Electrification, Line Extension; American Indians; 24 Power Transmission And Distribution; Power Transmission Lines; | |
| DOI : 10.2172/947555 RP-ID : DOE/CH/11240 RP-ID : FG02-04CH11240 RP-ID : 947555 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 947555.pdf | 648KB |
PDF