| Navajo Electrification Demonstration Project | |
| Battiest, Terry W. | |
| Navajo Tribal Utility Authority | |
| 关键词: Power Substations; American Indians; 24 Power Transmission And Distribution; Power Transmission Lines; 29 Energy Planning, Policy And Economy; | |
| DOI : 10.2172/991756 RP-ID : DOE/CH/11461 Final Report RP-ID : FG02-06CH11461 RP-ID : 991756 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 991756.pdf | 475KB |
PDF