科技报告详细信息
Geotechnical Analysis Report for July 2004 - June 2005, Volume 2, Supporting Data | |
Westinghouse TRU Solutions LLC | |
Waste Isolation Pilot Plant (N.M.) | |
关键词: Geomechanical Instrumentation System; Gis; Site And Preliminary Design Validation; Repository; Wipp; | |
DOI : 10.2172/926086 RP-ID : DOE/WIPP-06-3177, Volume 2 RP-ID : AC29-01AL66444 RP-ID : 926086 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
This report is a compilation of geotechnical data presented as plots for each active instrument installed in the underground at the Waste Isolation Pilot Plant (WIPP) through June 30, 2005. A summary of the geotechnical analyses that were performed using the enclosed data is provided in Volume 1 of the Geotechnical Analysis Report (GAR).【 预 览 】
Files | Size | Format | View |
---|---|---|---|
926086.pdf | 10592KB | download |