科技报告详细信息
Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2004 - June 2005, Volume 1
Westinghouse TRU Solutions LLC
Waste Isolation Pilot Plant (N.M.)
关键词: Geomechanical Instrumentation System;    Fractures;    Gis;    Site And Preliminary Design Validation;    Repository;   
DOI  :  10.2172/926085
RP-ID  :  DOE/WIPP-06-3177, Volume 1
RP-ID  :  AC29-01AL66444
RP-ID  :  926085
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since the completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2004, to June 30, 2005. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the Geomechanical Monitoring Program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and borehole observations. Chapter 8 summarizes the results of the geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists the references and bibliography.

【 预 览 】
附件列表
Files Size Format View
926085.pdf 856KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:8次